Home > Services > Demolition Simulation

Demolition Simulation

Stubb’s Tower Explosive Demolition
Savannah’s first explosive demolition. Simulated with ELS by NCSU

Charlotte Coliseum Implosion
The largest domed stadium to be imploded.

Ramallo Building Implosion
A mid-rise building in an urban setting with three neighboring structures.
Deconstruction Simulation
Structural elements removed simultaneously as the weight of moving equipment causes dangerous changes in internal stresses.

 

See Also

Demolition Simulation Download
(1.3 MB)

 

Demolition Engineering & Safety Report

This paper describes the work that ASI will perform as a part of its demolition analysis and simulations service.

 


The Applied Element Method - The Ultimate Analysis of Progressive Collapse

Read how AEM is superior to FEM as published in the April 2006 issue of Structure Magazine.